Following the close completion of works at Trinity College Dublin, I have inserted some update photographs below
1.

Chief Stewards Building
As you can see the completed roofing works on this old conservation building. We have used only the high quality of materials (Blue Bangor Slate with Copper Nails, Cast aluminium Guttering From Alumasc, Conservation Hydraulic lime mix for pointing works, Lead Flashing in Valley detail)
2.
Lead Detail worked to five bay window details ( I will show more detailed pictures in my next post)
3.
Installed polycarbonate (Natural Daylight Roofing Light), this light was installed on a build up system, consisting of:
Roofing Build Up:
1. Vapour Barrier
2. Insulation Boards
3. 3mm underlay (Torch on Membrane)
4. 4mm Cap Sheet (Torch on Membrane Black Mineral)
5. Timber Up-stand for lighting Detail